WVTT’S Jeff Andrulonis was at last night’s Smethport borough council meeting... Repairs to Hamlin lake dam consumed some of the discussion. E and M engineering has created a plan that calls for spillway repairs and sealant for the face of the dam- among other things. The entire project is estimated at $191 thousand dollars and will be paid out of existing borough funds so there’s no need to borrow money. For three years, DEP reported potential problems with the dam.
WVTT News Radio is the Twin Tiers radio news leader. We are at 96.7 in Olean, NY and 103.9 in Kane, PA. WVTT is part of family and locally owned Colonial Radio Group. If you see or have news, email us: news@colonial.cc. This site is loaded with information. Click the tabs, scroll down and review posts and info posts on the right! Remember you can watch Twin Tiers Morning News on News Channel 25 WVTT-TV in Olean and Time Warner cable channel 15.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment